The Highbury is a residential development by Ellington Properties in Mohammed Bin Rashid City, Dubai. Ellington describes two contemporary buildings rising over 29 storeys from a garden podium, joined by an interconnected plan and a stepped facade that climbs from the ground-level gardens to the upper-level apartments and roof terrace. The developer presents it as a 'vertical village' designed around family life.
Homes range from studios to four-bedroom apartments. The lower levels, from the 1st to the 21st floor, hold studios, one-, two- and three-bedroom apartments and a four-bedroom duplex; the upper levels, from the 22nd to the 29th floor, hold two- to four-bedroom apartments with maid's rooms, three- and four-bedroom duplexes and a single penthouse. Ellington's plans draw a balcony and a laundry room in every home, and its specification lists full-length wardrobes, integrated European-brand kitchen appliances, heightened ceilings in living areas and bedrooms, and VRF air conditioning.
Shared facilities are planned across the podium, a two-level pavilion and the 22nd floor. Ellington's amenity plans show an infinity leisure and lap pool with a Baja shelf, cabanas and sunken seating, a 170-metre jogging track, padel tennis and urban basketball courts, an outdoor herb garden, barbecue and outdoor dining areas, a pet area, a kids' splash pad and play area, and a community lawn. The pavilion is planned with a residents' clubhouse, a cinema room, a record lounge, a kids' play room, fitness and yoga studios and male and female spa rooms with steam and sauna, and the 22nd floor adds a second infinity-edge pool, a club lounge and a terrace facing the Downtown skyline.
The building stands beside North London Collegiate School and Hartland International School, about a minute away according to Ellington, which lists Meydan One Mall at 10 minutes, Downtown Dubai at 12, Dubai Mall and Burj Khalifa at 15 and Dubai International Airport at 17. Ownership is freehold. Construction is under way: Ellington has published monthly construction updates since May 2023, most recently for August 2026.
Payment plan: Ellington: 20% on booking, 20% within 120 days, 30% in later instalments, 30% on completion