Ellington Properties

Portside Square

DeveloperEllington Properties
CompletionQ4 2029
Total units408
StatusOff-plan
Price Range2,439,828 AED – 4,460,828 AED

About Project

Portside Square is a waterfront development by Ellington Properties in Mina Rashid, Dubai's historic port district. Ellington describes three residential towers whose facades draw on the rhythm of wind and water, alongside a dedicated office building, with the marina, dining and retail promenades on the doorstep. The developer lists driving times of about 1 minute to the Queen Elizabeth 2, 2 minutes to Mina Rashid Marina, 6 minutes to Sheikh Zayed Road, 10 minutes to Downtown Dubai and Dubai International Airport, and 14 minutes to DIFC. The development is made up of three residences, Portside Residences I, II and III, alongside the Harbour Light office building and ground-floor retail and food-and-beverage units. Each residence rises from a ground floor and a podium through 16 upper floors to a roof level, with a floor-to-floor height of 3.6 metres, and Ellington lists 136 homes in each and 408 in total: 18 studios, 57 one-bedroom, 32 two-bedroom, 18 two-bedroom-plus-study and 10 three-bedroom homes and one four-bedroom penthouse per residence. The developer's plan sheets set out nine home types across the three residences, from a 395.9 sq ft studio to a 3,440.79 sq ft four-bedroom duplex penthouse on the 15th and 16th floors with five bathrooms and a private stair. Every home has a balcony, a separate laundry room and fitted wardrobes, and the larger plans add a study room. Ellington allocates one parking space to studios and one- and two-bedroom homes and two to three- and four-bedroom homes, and describes kitchens with natural stone surfaces, warm wood finishes and integrated appliances, custom-designed wardrobes, expansive glazing and views across the marina, skyline and sea. Ellington's amenity plans show a first-floor landscaped deck with a leisure pool and a kids' pool, sun loungers and cabanas, a running track, an outdoor fitness area, an outdoor kids' play area, lawns and an amphitheatre seating area, with outdoor yoga on the podium level. A four-level amenity pavilion is planned with a cinema and games lounge and arcade on the ground floor; a spa with sauna and steam rooms, hot and cold plunge pools, aromatherapy rooms and aqua cycling, yoga and pilates areas, co-working pods and an indoor kids' play area on the first floor; a fitness studio with a juice bar on the second; and a clubhouse with a lounge, dining table, bar and shuffleboard on the third. At ground level the plans show drop-off areas, lobby lounges with reception and communal tables, bicycle parking, EV charging, and retail and food-and-beverage units. Each residence is planned with three passenger lifts and a service lift. Ellington Properties lists Portside Square as off-plan, with anticipated completion in Q4 2029 and freehold ownership. Its payment plan asks for 20% at booking, 30% in four instalments up to 360 days after reservation, 5% each when construction reaches 20%, 30%, 40% and 50%, and 30% on completion.

Payment plan: Ellington: 20% booking, 30% within 360 days, 20% at 20-50% construction, 30% on completion

Apartment Amenities

Included with Studio - Type A

  • High Ceilings
  • Balcony
  • Laundry Room
  • Parking Included
  • Built-in Kitchen Appliances
  • Built-in Wardrobes

Building Facilities

  • Children's Play Area
  • Children's Pool
  • Clubhouse
  • Cold Plunge
  • Elevators
  • EV Charging Stations
  • Fitness Center
  • Jogging Track
  • Kids Club
  • Landscaped Garden
  • Luxury Lobby
  • Outdoor Fitness Area
  • Parking
  • Sauna / Steam Room
  • Shared Spa
  • Shops
  • Sitting Area
  • Sun Deck
  • Swimming Pool
  • Yoga Deck
  • Yoga & Pilates Studio

Investment Highlights

On the Mina Rashid waterfront

On the Mina Rashid waterfront

Ellington places Portside Square beside Mina Rashid Marina in Dubai's historic port district, listing the Queen Elizabeth 2 about 1 minute away and Downtown Dubai and Dubai International Airport about 10 minutes by car.

Pool deck and amenity pavilion

Pool deck and amenity pavilion

Ellington's plans show a first-floor deck with leisure and kids' pools, cabanas, a running track and an outdoor fitness area, beside a four-level pavilion with a fitness studio, spa, co-working pods, a cinema and games lounge and a clubhouse.

Nine home types, studio to duplex penthouse

Nine home types, studio to duplex penthouse

Ellington's plan sheets set out nine types across the three residences, from a 395.9 sq ft studio to a 3,440.79 sq ft four-bedroom duplex penthouse. Every home has a balcony, a separate laundry room and fitted wardrobes.

Anticipated completion Q4 2029

Anticipated completion Q4 2029

Ellington lists anticipated completion in Q4 2029 and freehold ownership, with 20% paid at booking, 50% in instalments before completion and 30% on completion.

Sales Team Contact Details

Anna Kozlova
Sales representative

Anna Kozlova

Unrealty Agency

Back Monday at 9:00 Dubai time

Phone+971551952266
Emailanna@unrealty.ai
Call

The assistant can hand you to Anna at any point.

Unit Types

13 units available out of 408 total

Type
Units
Available
Area
Studio - Type A
54
0
395.90 sqft
1 Bedroom - Type A
111
4
767.90 sqft
1 Bedroom - Type B
60
1
791.69 sqft
2 Bedroom - Type A
36
2
1203.08 sqft
2 Bedroom - Type B
60
3
1172.94 sqft
2 Bedroom + S - Type A
30
1
1396.19 sqft
2 Bedroom + S - Type B
24
2
1409.53 sqft
3 Bedroom - Type A
30
0
1723.62 sqft
4 Bedroom Penthouse - Type A
3
0
3440.79 sqft

Floor Plans

Studio1
1 bedroom2
2 bedroom4
3 bedroom1
4 bedroom1

Studio - Type A

BedroomsStudio
Bathrooms1
Internal Area345.41 sqft
External Area50.48 sqft
Total Area395.90 sqft
Floors1-14
BalconyYes

Developer

Ellington Properties

Ellington Properties is a Dubai-based, design-led residential developer. Its homes span communities across Dubai, including Jumeirah Village Circle, Mohammed Bin Rashid City, Dubai Hills Estate, Business Bay and Palm Jumeirah, as well as Ras Al Khaimah. Ellington developments have received design awards, including recognition for DT1, Wilton Park Residences and Kensington Waters.

Similar Projects

Riverton House
Off-plan
Ellington Properties

Riverton House

Mohammed Bin Rashid City
24 floors151 units1-3 bdr
Payment planEllington plan: 20% on booking, 50% during construction, 30% on completion
Rosemont Residences
Off-plan
Ellington Properties

Rosemont Residences

Jumeirah Village Triangle
47 units1-2 bdr
Somerset Mews
Ready
Ellington Properties

Somerset Mews

Jumeirah Village Circle
2-2 bdr

Have Any Questions?

Our AI assistant is always ready to help you and answer any questions.