Belgravia III is a completed residential building by Ellington Properties in Jumeirah Village Circle (JVC), Dubai, and the third project in the developer's Belgravia series. Ellington lists it as ready, its construction-update page marks the project as completed, and the developer's portfolio lists it as delivered in 2021. Ellington describes a freehold building of ground, podium and four floors served by six lifts, which the developer says is home to its largest courtyard yet.
Ellington's factsheet lists 260 homes: 31 studios, 159 one-bedroom and 38 two-bedroom apartments, and 32 two-bedroom townhouses set over two levels with a ground-floor terrace. The developer describes family-friendly interiors inspired by Dubai's sunny skies and poolside setting, with a fresh, cool palette of penny round tiles, white joinery and light wood accents, durable quartz countertops and porcelain tile floors. Its factsheet also lists fitted wardrobes, European appliances with an integrated dishwasher and one parking space per apartment.
Ellington lists two lobbies with lounges, a clubhouse with a kitchenette, a leisure and lounge pool with pool loungers and a deck, a fitness studio, indoor and outdoor children's play areas, outdoor seating areas, a landscaped courtyard and 24-hour security. The developer's photographs of the completed building show the pool beside a pergola-shaded deck, poolside dining tables, a shaded outdoor play area, a children's playroom, a double-height clubhouse lounge, a games area with a foosball table and the fitness studio.
Ellington describes Jumeirah Village as a family-friendly community with parks, sports fields, schools and mosques. Its brochure and factsheet list driving times of about 10 minutes to Dubai Marina and Mall of the Emirates and 25 minutes to Dubai International Airport.